Monthly Archives: August 2011

Our 1st Solar Photovoltaic Install used for MCS Accreditation

On the roof is the horizontal schuco mounting system, there are two rails per row of panels and 4 rows in total. The panels used in this install are 12 x Del Solar D6M245B3A Panels which combine to make a array … Continue reading

Posted in Uncategorized | Leave a comment

Our 1st Solar Photovoltaic Install used for MCS Accreditation

Located in the loft is a SMA Sunny Boy 2500HF Inverter that converts the Solar Panel DV voltage into mains AC voltage and sends it back down to the consumer unit via the generation meter. Also located here is a … Continue reading

Posted in Uncategorized | Leave a comment

Our 1st Solar Photovoltaic Install used for MCS Accreditation

Main Ac Isolator  and an Elster A100C ofgem approved generation meter mounted neatly underneath the consumer unit. 

Posted in Uncategorized | Leave a comment

The long road to gaining MCS accreditation !!!

After several months of hard work implementing our quality management system and working closely with the NICEIC we are proud to announce we gained our MCS accreditation on 12/08/2011. http://www.microgenerationcertification.org/mcs-consumer/installer-profile.php?ID=83602

Posted in Uncategorized | Leave a comment